Wells’ Completion

Ref : OAG_CP_15
DURATION :
07 DAYS

Objectives

Gaining knowledge about how to equip the well, enabling us how to raise the hydrocarbons located in the reservoirs to the surface taking in consideration the future operational problems related to (Depletion “The production decline”, unwanted effluence and decrease in flow rates).

Public

The operators, technicians, supervisors and beginner producers, who do not have in-depth knowledge yet.

  • Flowing oil Wells’ equipment
  • Wellheads and their components
  • The tubing String
  • Well Packer and its type
  • The accessories and Safety Valve
  • Siege, Storm Choke, tubing-retrievable sub-surface safety valve (TRSV), Sliding Sleeve Door (SSD), Circulating Valve, Tubing Hangar.
  • the punching before and after the decent Completion
  • Completion Methods
  • Implementation Completion
  • Anchor Packer and decent completion
  • Well Securing
  • Problems and their solutions