Drilling And Cementing Operations

Ref : OAG_FC_17
DURATION :
07 DAYS

objectives

The hole preparation before the downhill casing and the cementing operation single stage, multiple stage and decent in addition to the liner cementing and the restoration of  poor cementing.

Public

The operators, technicians and supervisors, who handle and supervise cementing operations. This course is designed for the technicians, who work on cementing units without getting the required qualification so far.

  • Day 1

    Hole preparation before the downhill casing

    casing Role

    Casing different strings

    Casing Characteristics

    Day 2

    Casings Choices

    Casing string aids

    Casing String preparation

    Day 3

    Casing Handling Equipment

    Decent tubing

    Precautions to be taken during the downhill casing

    Day 4

    Preparation for cementing

    Cementing Equipment

    Cementing Calculation

    Day 5

    Cementing Single Stage

    Multiple-stage cementing with DV Tools (differential valve)

    Day 6

    Decent and liner cementing (string is lost)

    The problems and their solutions

    Day 7

    Practical Exercise