The hole preparation before the downhill casing and the cementing operation single stage, multiple stage and decent in addition to the liner cementing and the restoration of poor cementing.
Day 1
Hole preparation before the downhill casing
casing Role
Casing different strings
Casing Characteristics
Day 2
Casings Choices
Casing string aids
Casing String preparation
Day 3
Casing Handling Equipment
Decent tubing
Precautions to be taken during the downhill casing
Day 4
Preparation for cementing
Cementing Equipment
Cementing Calculation
Day 5
Cementing Single Stage
Multiple-stage cementing with DV Tools (differential valve)
Day 6
Decent and liner cementing (string is lost)
The problems and their solutions
Day 7
Practical Exercise